Jum Khola Jalvidhyut Aayojana (56 MW): Access Road

Road & Bridges

Sanima Jum Hydropower Limited is developing the 56 MW Jum Khola Hydroelectric Project in Dolakha District. To facilitate access to the project’s structures—including the powerhouse, adit, surge shaft, and headworks, camps about 4.1 Km access road is under construction from Kharane Kholsi to the Headworks of Jum Khola Hydroelectric Project.
The Section is divided as;

  1. Kharane Kholsi to Tamakoshi Bridge 1 (Common Road) : 924 m
  2. Common Road to Portal of Main Access Tunnel to PH : 345 m
  3. Common Road to Adit and Ventilation Tunnel Portal : 1000 m
  4. Lapche Road to Tamakoshi Bridge 2 : 220 m
  5. Tamakoshi Bridge 2 to Headworks and Camps : 1600 m

The Contract for the Construction of Project Access Road was done on 8 Falgun 2080 (20 Feb 2024) and the road construction work was completed on 18 Ashad 2082 (2 July 2025).