On February 10, 2026, (Magh 27, 2082), Bavari Construction Pvt. Ltd. entered into an agreement with Kalika Shahi Karna (J.V.) for the construction of a vertical pressure shaft for the 21.4 MW Nyadi Phidi Hydropower Project, owned by North Summit Hydro Limited. The scope of work includes the excavation of a 2.4-meter diameter vertical shaft using an Alimak Raise Climber Machine. Work has been successfully completed On July 16, 2026, (Ashadh 32, 2083).
Nyadi Phidi Hydropower Project (21.4 MW)
Hydropower Projects