Sanima Mai Hydropower Limited (SMHL) and Bavari Construction Pvt, Ltd (BCPL) entered into a contract agreement on 3rd Mangsir 2082 for the repair and rehabilitation of major Headworks components of the Mai Hydropower Project that sustained damage during the flood event of 18 Ashoj 2082. The scope of work encompasses the restoration of the Stilling Basin, Flood Wall, Settling Basin, Headrace Culvert and other associated structural elements.