Jum Khola Jalvidhyut Aayojana (56 MW): Main Civil Works

Hydropower Projects

The Jum Khola Hydropower Project (56 MW), promoted by Sanima Jum Hydropower Limited, is a run-of-the-river type project. The headworks structures of the project are located on the left bank of the Jum Khola, approximately 1 km upstream from the confluence of Jum and Lapche Khola. The main physical structures of the project include a diversion weir, Undersluice, intake, gravel trap, underground settling basin, headrace tunnel, penstock shaft, powerhouse, and tailrace. A construction agreement for these structures was signed between the promoter company and this company on Jestha 20, 2078.

Under this agreement, the company has currently been advancing works such as mobilizing machinery and technical personnel at the project site, along with parallel progress in constructing residential buildings at Lamabagar and the headworks. Additionally, temporary alternatives for transportation, such as Tuin and footbridges, have also been constructed.