Sankhuwa Khola Hydropower Project (41.06 MW)

Hydropower Projects

On 9 September 2026, Sirubari Construction Pvt. Ltd., the Main Contractor, entered into a Subcontract Agreement with Bavari Construction Pvt. Ltd. for the pilot hole excavation of a 69.5 m vertical shaft and a 67.14 m surge shaft under the 41.06 MW Sankhuwa Khola Hydropower Project, being developed by Gurans Hydro Ltd. as the Employer, and situated in Sankhuwasabha District, Nepal.

Related Projects

keyboard_arrow_up