On June 25, 2025 (12 Ashad 2082), Bavari Construction Pvt. Ltd. entered into an agreement with Fewa Construction Pvt. Ltd. for the excavation of critical underground structure for the 285 MW Upper Tamor Hydropower Project, owned by Tamor energy Limited.
Scope of work
Construction of a 300-meter Adit tunnel with dimensions of 3.2m*3.5m to facilitate access for the surge shaft excavation
Excavation of a 147- meter long, 17.5- meter diameter surge shaft
Excavation of a 370-meter long, 5.4-meter diameter vertical shaft.
![]()