The company has successfully completed and handed over various works for the Middle Tamor Hydroelectric Project (73 MW), promoted by Sanima Middle Tamor Hydropower Limited. These works included the construction of access roads, a steel bridge, the powerhouse, construction camps at the headworks, and a guard post. Additionally, the company provided machinery for the project on rent, including a boom crane, excavator, loader, and tractor. After completion, the project began its commercial electricity production on 23 Baisakh 2080 and has been transmitting electricity to the national transmission line.
Middle Tamor Hydropower Project (14.3 MW): General Facilities and Day-works